2013 Current Projects
RD 799 RD 799 RD 799 RD 799
RD 799 RD 799    

Dutch Sl Levee repair conducted by CES and HDR Engineering, Inc.
RD 799 RD 799    

2013 Levee Repair Projects conducted by Controlled Environmental Services, Inc. & HDR Engineering, Inc.
RD 799 RD 799 RD 799 RD 799
RD 799 RD 799 RD 799  

2013 Ditch Cleaning Projects
RD 799 RD 799 RD 799 RD 799
RD 799 RD 799    

Dutch slough erosion repair conducted by Ces in 2012. Landowners are asked to please report any areas on the levee that look like this.
RD 799 RD 799 RD 799 RD 799
RD 799      

Levee Repair
RD799 RD799 RD799 RD799
RD799      
Annual Vegetation Control
RD 799 RD 799 RD 799 RD 799
Pump Station # 4 Pipe Repair Project
RD799 RD799 RD799  
Levee Mowing
 
Beaver Repair Project Total Repair Cost: $14,074.22
RD &99

Beaver Hole After

RD 799

After

RD799’s Beaver Dam Control:

Reclamation District’s personnel conduct daily routine beaver dam inspections. During the late hours into the night beavers are hard at work engineering and building beaver dams. The dams are built either in front of or behind our drainage grates. The beaver’s dams cause a blockage and does not allow for the water level in the ditch to drain. The water levels in the ditch begin to rise. This can cause potential damage to the island.

RD 799

Beaver Hole Before

RD799’s Beaver Dam Control: Restoration of Water Flow:

These pictures demonstrate the water level being lowered once a beaver dam has been cleared from either in front or behind the grate.

RD 799

Before